Concrete Mix Calculator (Cement, Sand & Aggregate)
Standard residential slab is 4 to 5 inches
Number of identical slabs, columns, or footings
Slabs, beams (residential)
3-5% for flat machine-mixed slabs; 8-10% for hand mixing or rough trenches.
Result Summary
2,397.8 kg total (Standard 50kg OPC/PPC bags)
How to Order Materials in Nepal
When purchasing building materials in Nepal, cement is sold per 50 kg sack (OPC for structural elements, PPC for plaster/brickwork). Sand and coarse aggregate (Rodi) are typically quoted in CFT (Cubic Feet) or by the tractor load (approximately 100 to 110 CFT per standard trolley).
Always ensure sand is washed river sand (free from silt) and aggregate is clean crushed stone (20mm down for slabs and 40mm for mass concrete foundations).
Standard Concrete Grades & Mix Proportions (IS 456 / NBC)
| Grade | Mix Ratio (C : S : A) | 28-Day Strength | Cement Bags / m³ | Typical Application in Nepal |
|---|---|---|---|---|
| M5 | 1 : 5 : 10 | 5 N/mm² | ~2.8 | Mass concrete, mud mat foundation base |
| M7.5 | 1 : 4 : 8 | 7.5 N/mm² | ~3.6 | Plain cement concrete (PCC), stone masonry bedding |
| M10 | 1 : 3 : 6 | 10 N/mm² | ~4.4 | Sub-base flooring, compound perimeter walls |
| M15 | 1 : 2 : 4 | 15 N/mm² | ~6.3 | Non-structural slabs, walkways, plinth filling |
| M20 ★ | 1 : 1.5 : 3 | 20 N/mm² | ~8.1 | Standard RCC house slabs, beams, lintels (Most common) |
| M25 | 1 : 1 : 2 | 25 N/mm² | ~10.7 | Heavy structural columns, deep footings, water tanks |
★ Note: M20 is the minimum grade recommended by Nepal National Building Code (NBC) for reinforced concrete structural members.
The 1.54 Dry Volume Factor Explained
Measure Wet Volume
Compute the geometric volume of your formwork: Length × Width × Thickness. For example, a 30 ft × 20 ft slab at 4 inches thick = 200 CFT (5.66 m³).
Multiply by 1.54
Water fills voids between aggregate and sand grains, reducing bulk volume by ~35%. Multiplying by 1.54 converts required wet concrete into raw dry bulk materials to buy.
Distribute by Mix Ratio
Divide dry volume by the sum of parts (e.g. 1 + 1.5 + 3 = 5.5 for M20). Multiply by cement, sand, and aggregate ratios, and add 5% for site spillage.
Recommended Material Wastage Allowances
| Pour Scenario | Recommended Wastage | Practical Explanation |
|---|---|---|
| Machine-mixed slab with smooth plywood shuttering | 3% to 5% | Minimal leakage through sealed joints and uniform depth |
| Columns, beams, and tight formwork | 5% to 7% | Spillage during bucket lifting or concrete pump hopper transfers |
| Hand-mixed batches on open ground | 8% to 10% | Material loss on soil floor, wind dispersion of dry cement dust |
| Foundation trenches and irregular earth excavations | 8% to 12% | Rough trench walls absorb extra concrete beyond exact blueprint dimensions |
Frequently Asked Questions
What is the standard concrete mix grade used for residential house slabs in Nepal?
In Nepal, residential RCC slabs and beams almost universally specify M20 grade (nominal ratio 1 : 1.5 : 3 of cement : sand : aggregate). For columns, heavily loaded shear walls, and footings, structural engineers often recommend M25 (1 : 1 : 2). Non-structural elements like plinth soling, compound walls, or floor leveling use leaner mixes such as M10 or M15.
How many cement bags are required per cubic meter (m³) of M20 concrete?
For standard M20 nominal mix (1:1.5:3), approximately 8.0 to 8.2 bags (50 kg each) of cement are required per cubic meter of finished wet concrete. This calculation includes the mandatory 1.54 dry volume expansion factor before adding any contractor site wastage allowance.
What is the dry volume factor (1.54) and why must it be applied?
When dry cement, sand, and aggregate are mixed with water and compacted on site, the dry granules settle into each other's voids, shrinking the total volume by roughly 33% to 35%. Therefore, you must order 1.54 cubic meters of dry materials for every 1.0 cubic meter of solid compacted concrete desired. Ordering based on wet volume alone results in running out of concrete mid-pour.
How much material is needed for a 100 sq. ft. slab with 4 inches thickness in Nepal?
A 100 sq. ft. slab at 4 inches (0.333 ft) thickness has a wet volume of 33.33 cubic feet (0.944 m³). Applying the 1.54 dry volume factor yields 51.33 CFT of dry mix. For standard M20 concrete (1:1.5:3): you need approximately 7.5 to 8 bags of cement (50 kg), 14 cubic feet of sand (~0.14 tractor trolley), and 28 cubic feet of aggregate (~0.28 tractor trolley), plus roughly 5% extra for formwork wastage.
How much sand and aggregate (rodi) fit into a standard tractor trolley in Nepal?
In Kathmandu, Pokhara, and across Nepal, local supply yards measure aggregates by the tractor trolley or tipper truck. A standard two-wheel drive tractor trolley holds approximately 100 to 110 CFT (cubic feet) of sand or crushed stone. A larger 6-wheeler tipper truck typically carries 300 to 350 CFT.
What is the recommended water-cement ratio for hand-mixed or machine-mixed concrete?
The recommended water-cement ratio by weight is between 0.45 and 0.55. For every 50 kg bag of cement, you need approximately 25 to 27 liters of clean water. Adding excessive water makes concrete easier to pour but drastically reduces its 28-day compressive strength and causes shrinkage cracks.